Progress for the Mac session-node objective. Progress is published here so it does not have to be reported in chat.
Where it stands. The 08:00:21 UTC certificate (all gates passed, 6 of 6 live checks, 0 denials, declared PARTIAL) is still the certificate of record for D1-D6. The certify booked for 13:36 UTC was released, not run: the D3 and D4 live checks would have failed because their test sessions were ended at 08:01 UTC under the Hive rule. The next certify runs when the open items close; no time is set.
Placement is held at the Architect's direction (12:58 UTC). Menu wiring and the first real menu start wait until the M1-M4 parity matrix and the supporting-process coverage pass on all four Macs. The placement launcher was rolled back on M1, M2 and M3 and stays undeployed. Defect fixes continue (PM ruling 15:0x UTC). Earliest wiring on all four Macs: about 18:15 UTC, if the owners' estimates hold.
500 sessions. New per-Mac caps went live at 15:5x UTC: M1 180, M2 238, M3 32, M4 52 (502 in total). With the memory-reserve items landed (15:57 to 16:01 UTC), live admission is 403: M1 82 (limited by disk), M2 238, M3 32, M4 51. Reaching 500 needs M2's sessions on a terminal server with the raised open-file limit: route A restarts M2's server and is timeboxed to 18:00 UTC; Route A was not ready at 16:16 UTC (the Architect is attached to 3 M2 sessions and 12 are unsaved). If it has not happened and been certified by 18:00 UTC, route B (a second terminal server on M2) is built in scratch only; nothing of it deploys while the parity hold stands.
| Deliverable / task | State | Execution type | Dependencies | Agent / model executing | Time elapsed | Estimated completion |
|---|---|---|---|---|---|---|
| D1 Decision record | CERTIFIED 4 certifies, latest 08:00:21 UTC |
Complete | None open | None (done) | not recorded | Done; re-checked at the next certify |
| Today's rulings kept as ruling files: panel rulings on the L8 launcher carry (12:0x), the M3 memory reserve (14:2x) and the route to 500 (14:3x); the PM's ruling that the M2 proof runs on a private terminal socket (11:0x) | RECORDED | Single tasks | None | Panel (Grok, OpenAI, Gemini, 2 of 3); for the 12:0x ruling Grok's seat dropped on a credit limit and OpenAI and Gemini agreed. PM for the 11:0x ruling | not recorded | Done |
| D2 Live telemetry on M1-M4 | CERTIFIED 4 certifies, latest 08:00:21 UTC |
Complete | None open | None (done) | not recorded | Done |
| Dashboard selftest window. Window 1 (11:56 UTC) closed with no selftest run: the Pi lane's capture was blocked at sign-in. Window 2 opened 13:05:32 UTC; the selftest ran OK at 13:10:31 UTC; access removed and the dead-man disarmed at 13:11:29 UTC | DONE 13:11 UTC | Dependent (Hive release, then the dashboard lane's go-ahead, then the filed access change) | None now | Plan owner with the infrastructure dashboard lane and the Pi lane | Window 2: 6 min | Done |
| Session-admission disk check reads the free space macOS reports for important use on M1 and M2 (raw figure on M3 and M4) | LIVE M1-M4 since 08:41 UTC | Dependent chain (build, audit, deploy M1, then M2-M4) | None now | not recorded | Build done 08:20, all four Macs live 08:41 UTC | Done |
| D3 Session placement working live on the Macs | CERTIFIED 05:00:19 and 08:00:21 UTC WIRING HELD Architect, 12:58 UTC |
Certified; follow-up work runs as concurrent lanes, each a dependent chain | Architect's hold: parity matrix and supporting processes pass on all four Macs (see below) | Build, audit and executor agents; model not recorded | Original proof 02:21 to 03:34 UTC (1 h 13 min) | Wiring on all four Macs earliest about 18:15 UTC (contingent) |
| M2 opened for placement (L6): opened 12:49:26 UTC; proof session placed through the real path on M2 (private socket) ended clean at 13:00:54 UTC; independent verify passed 13:12 UTC | DONE 13:12 UTC | Dependent chain (deploy, M2 tracker check, driver, open, post-check, proof, verify) | None now | M2 open executor and its verify stage; model not recorded | 11:25 to 13:12 UTC (1 h 47 min) | Done |
| Lease driver set to all four Macs (supporting row P1): set 13:54:06 UTC; post-check passed 13:54:51 UTC (34 M1 sessions adopted, none over cap); negative control failed first as required | DONE 13:54 UTC | Dependent (stage, audit, apply) | None now | Build and audit agents; model not recorded | 13:2x to 13:54 UTC (about 30 min) | Done |
| Balanced placement r16 (a session starts on the Mac with open capacity, as the Architect directed), carrying the L2 and L3 fixes. Audit round 5 passed 14:2x; fix 6 done 15:1x; audit 6 failed narrowly 15:4x; fix 7 running | FIX 7 | Dependent chain (build, audit, fix); concurrent with the other lanes | Audit pass, then landing; deploying it is wiring, so it waits for the Architect's hold | Build agent and independent audit agents; model not recorded | 11 h 14 min (since 05:15 UTC) | not recorded (last stated about 15:00 UTC, passed) |
| Remote start onto M3 and M4 (supporting row P9). Fix 2 done 16:13 UTC (the router is the only product change); audit 3 passed with conditions; fix 3 running, then a narrow audit 4, then landing the helper and router. Deploy items held until the change gate can classify the placement folder; config and launcher items need real start proofs on M2, M3 and M4. Starts onto M1 refused until the M1 folder-trust answer (P13) | FIX 3 | Dependent chain (design, build, audit, fix, land) | Gate classification of the placement folder; P13 for M1 only | Build agent and independent audit agents; model not recorded | 3 h 5 min (design written 13:24 UTC) | Build about 17:00, audit and land about 17:45 UTC |
| Session start from the v200c menu goes through placement (L8). Landed and deployed on M1 at 12:25 UTC; rolled back at 12:58:26 UTC for the Architect's hold; M2 and M3 rolled back 13:0x UTC. All four Macs run a launcher without the placement change | HELD | Dependent | Architect's hold lifted; P9 landed; launcher redeployed to M1-M4 from origin; one real menu start | not recorded | Landed 12:25 UTC; held since 12:58 UTC | Earliest about 18:15 UTC (needs the save-continue lane's graceful-quit fix on M3 and M4) |
| D4 Sessions survive a real restart of M4 | CERTIFIED 08:00:21 UTC |
Certified; restart follow-up in flight | None open for the certificate of record | Drain build, audit and install agents; model not recorded | Attempt 3: 06:15 to 06:42 UTC (27 min) | Done (real restart 06:34:48 UTC, 4 of 4 sessions recovered, independent check 06:47 UTC) |
| D4 live check at the next certify: its test sessions were ended at 08:01 UTC, so the next certify needs a fresh M4 restart run or re-placement records | NEXT | Dependent | Next certify booked | not recorded | Not started | not recorded |
| Placement drain hook for Pi-driven Mac restarts (Architect direction 13:5x UTC: the Pis may restart whole Macs). Built 14:2x; audit 1 failed; fix 1 done 15:28; audit 2 passed 15:5x UTC. Install paused at 16:01 UTC for a shellcheck fix and resumed 16:07 UTC. Done: the ten landing filings, INSTALL-HOOK-M6 (CGR-M7-007369, post-check passed, confirmed by the Pi lane), the wording fix and the inert status and dry-run checks. Waiting: the Pi drain keys on M6 (no write to M6's key file 16:30 to 17:00 UTC during the Pi lane's key-narrowing canary, and another session's lock on that file to 16:50 UTC). A further fix round runs in a separate folder | INSTALLED keys waiting | Dependent chain (design, build, audit, fix, install, keys) | Pi lane deploys its restart-lease store on pi-01 (waits for a freeze release there, or 19:30 UTC) | Build, audit and install agents; Pi lane for the Pi side; model not recorded | About 2 h 34 min (since 13:5x UTC) | Pi drain keys earliest 17:00 UTC; drain usable about 30 min after the pi-01 store deploys |
| D5 500 concurrent sessions | CERTIFIED 3 certifies, latest 08:00:21 UTC (measured ceiling) 500 LIVE: OPEN 403 at 16:01 UTC |
Concurrent levers, each a dependent chain | Route A (M2 terminal server restart), timebox 18:00 UTC; else route B | Caps and reserve builders, landing executor, M2 parity lane (lane 28); panel for the route | Original ramp 00:11 to 00:27 UTC (16 min) | Route A: after the M2 restart (timebox 18:00 UTC) and the M2 cap re-derive. Route B: ready to land about 02:00 to 03:00 UTC on 19 Nov, live after the Architect lifts the parity hold |
| Real per-session cost measured on M4 (L14): 20 idle sessions; memory 0.138 GiB per added session; idle CPU 0.0041 cores per session. The Architect (via the PM) ruled memory is not the limit and directed the caps be re-derived | DONE 12:25:53 UTC | Single run | None now | not recorded | 11:56:39 to 12:25:53 UTC (29 min) | Done |
| Per-Mac caps re-derived (memory, terminals, processes, terminal-server files) and deployed, 11 filed items: M1 180, M2 238, M3 32, M4 52 = 502 | LIVE 15:5x UTC | Dependent chain (build, 4 audit rounds, land, deploy) | None now | Caps builder, audit agents, landing executor; model not recorded | 12:5x to 15:5x UTC (about 3 h) | Done |
| M3 and M4 memory reserve items: all 4 landed and deployed, the last three from 15:57 to 16:01 UTC (CGR-M7-007247, CGR-M7-007249, CGR-M7-007253) once the reserve sheet carried its required disclosure; all post-checks passed, no rollback. Live admission 403 | LIVE 16:01 UTC | Dependent (disclosure added, then landing) | None now | Reserve builder, landing agent; model not recorded | Rebuilt 15:0x, landed by 16:01 UTC | Done |
| Open-file limit for new terminal servers raised from 256 to 8192: M3 13:53:47, M4 14:06, M2 14:17 UTC. M2's running terminal server keeps 256 until it is restarted | DONE 14:17 UTC | Concurrent per Mac | None now | M2 parity lane (lane 28) | not recorded | Done |
| Route A: restart M2's terminal server onto the new limit, then re-derive the M2 cap (238 to about 348; projected fleet 502). Waits on all its conditions: every M2 session owner saved with no live work, no attached client, a fresh readiness signal, filed. NOT READY at 16:16 UTC: the Architect is attached to 3 M2 sessions and 12 are unsaved | NOT READY open to 18:00 UTC | Dependent chain (readiness, restart, re-derive) | All restart conditions met; the re-derive refuses any server started before 14:17:12 UTC | M2 parity lane runs the restart; OBJ-04 runs the re-derive | Not started | Timebox 18:00 UTC |
| Route B (only if route A is not done and certified by 18:00 UTC): a second terminal server on M2 for new sessions, built from 18:00 UTC in scratch only; no deploy while the parity hold stands (its 4 blocking consumers are parity-held files). Design note done 14:5x UTC; about 26.5 h of blocking work | PREPARED | Dependent | 18:00 UTC timebox; the Architect lifting the parity hold for go-live | Design-note agent (done); model not recorded | Design only | Ready to land about 02:00 to 03:00 UTC on 19 Nov if started at 18:00 UTC |
| M1 disk room: Time Machine local snapshot deleted (13:2x UTC, important-use free 105.8 to 133.6 GiB); its daily backup job retired (13:18:05 UTC); 44 folders archived to M2, each checksum-verified before and after (32.10 GiB freed; M1 about 211 GiB free). M1 admission was still disk-bound at 82 sessions at 15:52 UTC | DONE 14:5x UTC | Concurrent | None now | Archive agent; model not recorded | not recorded | Done |
| D6 Reversibility and durable record | CERTIFIED 4 certifies, latest 08:00:21 UTC |
Complete; kept current as work lands | None open | Plan owner | not recorded | Done |
| Reversions used today, each a filed change: placement launcher rolled back on M1 (12:58:26 UTC), M2 and M3 (13:0x UTC); M1 disk floor lowered to 90 GiB (12:53 UTC) and restored to 100 (13:2x UTC). Old slot-claim program kept on each Mac; the M1 archive moves have restore scripts, and the folders cleared for deletion carry a delete-after date of 2026-12-18. The plan owner's running lane record is kept append-only | DONE | As each change lands | None | Plan owner | not recorded | Ongoing |
| Work | State | Execution type | Dependencies | Agent / model executing | Time elapsed | Estimated completion |
|---|---|---|---|---|---|---|
| Menu wiring on all four Macs (placement through the onboarding menu) | HELD Architect, 12:58 UTC | Dependent | Parity matrix and supporting-process rows below; P9 lands (about 17:45 UTC); launcher redeployed to M1-M4; one real menu start | not recorded | Held since 12:58 UTC | Earliest about 18:15 UTC (contingent) |
| Next certify, aiming for COMPLETE | HELD | Dependent | Open items closed with real evidence; fresh live evidence for D3 (a live placed keep-alive session) and D4 (a fresh M4 restart run or re-placement records) | Completion gate (automatic checks, not a model) | Not started | not recorded (forecast only once items close) |
| Gitea canary session on M1 (OBJ-04 runs the canary kit for the integrator lane); it runs one filing from that lane's pre-filled command before its edit | SCHEDULED | Dependent | The integrator lane's order revision 4 and its checksum (by 18:15 UTC); kit re-pinned to it | Canary kit; model not recorded | Not started | Start 18:40 to 18:45 UTC |
| Plan-owner session restart (planned save-and-continue; the successor resumes from the lane record) | PLANNED | Single step | After the Gitea canary starts | Plan owner | Not started | About 18:50 UTC |
| This progress page: first publish. Attempt 1 (CGR-M7-007424, accepted 16:22:39 UTC) created the site, but its built-in check read the custom domain once, a second after attaching it, and stopped; the filed rollback removed everything cleanly at 16:24:04 UTC. The check now waits for the domain to become active; re-filing follows an independent audit | RE-FILING | Dependent chain (fix, audit, check, file, publish, verify) | New filing accepted | Publish agent and independent auditor; model not recorded | Attempt 1: 16:22 to 16:24 UTC | not recorded |
| Item | What it is | Owner | State | What closes it |
|---|---|---|---|---|
| L2 | A corrupt lease file can make the placement program fail and the session start locally, ignoring the cap. Normal writers never produce such a file | OBJ-04 | OPEN fix built into r16; r16 audit not yet passed | r16 passes audit, lands and deploys; re-certify |
| L3 | An old dead lease can briefly make a new one count twice, giving a false refusal one session short of the cap. Errs toward refusing, never overcommitting | OBJ-04 | OPEN fix built into r16; r16 audit not yet passed | Lands with r16 |
| L4 | The launcher's placement step needs a standard macOS tool (perl); Ctrl-C during a decision. Ruled 10:5x UTC: Ctrl-C skips placement and starts locally | OBJ-04 | HELD with L8 (Architect's wiring hold) | Fixed inside the L8 launcher change; closes with its deploy and a real menu start |
| L6 | M2 not open for placement | OBJ-04 | EVIDENCE IN opened 12:49:26 UTC, proof 13:00:54 UTC, verify passed 13:12 UTC | Resolution recorded at the next certify |
| L8 | Starting a session from the v200c menu does not yet go through placement | OBJ-04 | HELD landed 12:25 UTC, rolled back 12:58 UTC for the Architect's hold | Hold lifted, launcher redeployed to M1-M4, a real menu start (earliest about 18:15 UTC) |
| L14 | Live admission below the 500 target. Caps total 502; live admission 403 at 16:01 UTC (M1 82, limited by disk; M2 238; M3 32; M4 51). The 500 target is the Architect's and is not waived | OBJ-04 | OPEN route A timeboxed to 18:00 UTC | M2 terminal server on the raised limit and the M2 cap re-derived (route A), or route B; then admission proven live |
| L1 | Sessions placed on M2-M4 cannot yet save and restart there. The 13:0x UTC M2 attempt took a snapshot that was incomplete (session not pinned) and did no restart; restart and read-back on M2 remain unproven | M2 parity lane and Hive lane | OPEN | The owning lane's real save-and-restart of a pinned session on M2-M4 |
| L5 | Save-and-restart does not work on M3/M4 yet. The save-continue lane said at 10:4x UTC this is not in its plan and not today; it first needs the local Hive block and session-tracker hook on M3/M4 | Save-continue lane and M2 parity lane | OPEN not today, per the owning lane | The owning lane's sign-off and one save-and-restart per Mac |
| Checker fix | A check script misread a grant whose reason had spaces when M3 was opened. Fix built and audited in a new batch; the old batch is kept intact as the record | OBJ-04 | UNRECORDED M2 opened 12:49 UTC; the record does not say whether the fixed checker was used | Used in a Mac opening |
| L7, L9, L10 | Scope statements, not defects: the ceiling was measured on M2 only (M3/M4 are projections); the dashboard's session-admission action is deliberately off; one isolation check was reworded to what it proves | OBJ-04 | DISCLOSED | Closed only by real new evidence |
L11, L12 and L13 recorded that D5, D4 and D3 were not proven on the evening of 17 Nov. All three were overtaken by the certifications below.
Set 12:58 UTC: no menu wiring and no first real menu start until the M1-M4 parity matrix and the supporting-process coverage pass. The Architect also asked for a Mac column in the onboarding menu. No partial (M1/M2-only) wiring. Estimates below are each owner's, as recorded.
| Row | Gap | Owner | State / estimate (UTC) |
|---|---|---|---|
| P1 | Lease driver served M2 and M3 only | OBJ-04 | CLOSED 13:54:51 |
| P2 | M2 session puller copied active rows only (ghost M1 sessions on M2) | STW 48 | DONE on M2 (14:3x report) |
| P3 / matrix 7b | Restart scripts on M2-M4 differ from origin | Save-continue lane | About 16:00; M3/M4 pass only with that lane's graceful-quit fix |
| P4 | Reapers, janitor, idle and auto-pause jobs, PM reconcilers run on M1 only | Lane 28 | About 17:00 (janitor part held for a ruling) |
| P5 / matrix 8b | M3/M4 session rows did not reach the M1 roster | STW 48 (plus lane 28 install) | P5 VERIFIED 15:39:08, using an OBJ-04 canary session on M3 (15:29 to 15:38); lane 28 install part 16:00 to 17:00 |
| P6, P7 | Architect-message, teamwork and conflict-check see M1 (and M2) only | Lane 28 (PM slot) | About 15:00; closure not yet in the record |
| P8 | Save-continue snapshot and restart pieces on M1 only | Save-continue lane | About 16:30 |
| P9 / matrix 11b | Remote start reaches M2 only | OBJ-04 | FIX 3 audit 3 passed with conditions; last recorded estimate: land about 17:45 |
| P10a | Console sessions table shows M1 only | Console lane (abbiui 95) | Release 3, 16:30 to 18:00 |
| P10b | Console PM and Monitor tabs and the session dashboard show M1 only | Infrastructure dashboard lane | After today's certificate |
| P11 | No tracker push job on M2; own-host filter on M1 | STW 48 | Filter about 15:20, M2 push 16:00 |
| P12 | Session-close poller per host | STW 48 | DEFERRED panel 3-0 |
| P13 | On M1 the current Claude build does not keep folder trust for the home folder, so manual starts stop at a trust prompt | Lane 28; the setting is the Architect's | AWAITING the Architect's yes or no; M1 remote starts and M1 wiring depend on it |
| P14 | Blank original-session field on M1 root rows | STW 48 | CLOSED 14:01, by design, no change |
| P15 | M2, M3 and M4 have no session-launch helper | Lane 28 | no estimate recorded |
| Matrix 7c | On M2, M3 and M4 the save-continue snapshot row goes to the local Hive only | Hive lane (or save-continue lane) | About 16:00; worst case 17:15 |
| Mac column | Mac column in the onboarding menu (the Architect's request) and a cross-host menu listing | M2 follow-up lane; lane 28 carries it to M2-M4 | Owned; the lane reports landing |
| Matrix 4d/5b | 5 resumed M2 sessions had no boot prompt and no MCP tools | Lane 28 (owners restart) | About 15:30; closure not yet in the record |
| Matrix 4c, 9, 12b, F4a/F5 | Local-Hive forwarder, terminal versions (per-host exception), file-resolver 403, M3 shell setup and auth | Lane 28; PM ruling for 9 | CLOSED (F4b closes with P9) |
| When (UTC) | Result | Deliverables certified | Declared |
|---|---|---|---|
| 2026-11-17 21:51 | Certified | D1, D2, D6 | not recorded on this page |
| 2026-11-18 02:00:20 | PASS, all gates, 0 denials | D1, D2, D5, D6 | PARTIAL |
| 2026-11-18 05:00:19 | PASS, all gates, 0 denials | D1, D2, D3, D5, D6 | PARTIAL |
| 2026-11-18 08:00:21 | PASS, all six gates, 6 of 6 live checks, 0 denials | D1, D2, D3, D4, D5, D6 | PARTIAL |
| 2026-11-18 13:36 (booked) | Released, not run: the D3 and D4 live checks would fail (test sessions ended 08:01 UTC) and the result would still be PARTIAL | None | Not run |
Times are UTC unless marked EST (UTC minus 5 hours); "13:0x" means a time recorded only to the ten-minute mark. Sources: the plan owner's running lane record (as read at 16:29 UTC) and the supporting-process owner and estimate table (to 15:5x UTC). Fields shown as "not recorded" were not in those sources and are left unknown rather than guessed. Where the record does not name a deliverable for a piece of work, this page groups it under the deliverable it serves. This page shows state; it does not rule on completion. The final close needs a COMPLETE certificate and the Architect's own typed confirmation.